|
|
|
|
|
A Fuzzy Collaborative Forecasting Approach for WIP Level Estimation in a Wafer Fabrication Factory |
|
PP: 1465-1470 |
|
Author(s) |
|
Toly Chen et al,
|
|
Abstract |
|
Forecasting the work-in-process (WIP) level is very important for the control of factory. However, the uncertainty in the
WIP level is not easy to deal with. To solve this problem, a fuzzy collaborative forecasting approach is proposed. And also we show the
effectiveness of the proposed methodology with a case study.
|
|
|
|
|
|